MFO: Quick Start
Note: Mine Flow Optimization (MFO) and Material Allocation Optimization (MAO) are fully integrated in Studio NPVS+ meaning additional optimization isn't required. As such, these modules do not appear in Studio NPVS+. If you're interested in upgrading to Studio NPVS+, contact your local Datamine office.
-
Follow the steps described in MAO Quick Start.
-
Display the MAO-MFO Optimization Settingsscreen.
-
On the Optimization tab, select MFO: Optimize mine flow for Scheduler OES.
-
Define constant or time variable maximum mining rates.
-
Run MFO.
Related topics and activities
